πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR Β· WEST

Solar project 1, Douglas County

Solar project 1, Douglas County is a 250 MW solar request withdrawn in the West interconnection queue, in Douglas County, Washington, connecting to Chelan County Public Utility District.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1
Grid region
West (non-ISO utilities)
Utility / transmission owner
Chelan County Public Utility District
Connection point (POI)
Rocky Reach 230 KV Switchyard
Location
Douglas County, Washington
Technology
Solar: 250 MW
Total requested
250 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
15 August 2018
Proposed online date
October 2023

Location

Marker shows the centre of Douglas County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Douglas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem