United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

BATTERY STORAGE Β· WEST

Battery storage project 76, King County

Battery storage project 76, King County is a 100 MW battery storage request withdrawn in the West interconnection queue, in King County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
76
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Christopher 115 kV Substation
Location
King County, Washington
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Study phase
Terminated
Queue status
Withdrawn
Entered queue
9 September 2019
Proposed online date
August 2025

Location

Marker shows the centre of King County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in King County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem