United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMSolar project AC1-031, Carroll County
Solar project AC1-031, Carroll County is a 2.0 MW solar request withdrawn in the PJM interconnection queue, in Carroll County, Maryland, connecting to BGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2016 (completed)
- Withdrawn / abandonedAug 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC1-031
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Hampstead 13 kV
- Location
- Carroll County, Maryland
- Technology
- Solar: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 1 August 2016
- Proposed online date
- June 2017
- Withdrawn
- August 2017
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Other requests in Carroll County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem