United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

SOLAR Β· PJM

Solar project AC1-031, Carroll County

Solar project AC1-031, Carroll County is a 2.0 MW solar request withdrawn in the PJM interconnection queue, in Carroll County, Maryland, connecting to BGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2016 (completed)
  2. Withdrawn / abandonedAug 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AC1-031
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
BGE
Connection point (POI)
Hampstead 13 kV
Location
Carroll County, Maryland
Technology
Solar: 2.0 MW
Total requested
2.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
Queue status
Withdrawn
Entered queue
1 August 2016
Proposed online date
June 2017
Withdrawn
August 2017

Location

Marker shows the centre of Carroll County; the queue data does not give exact sites.

Power plants in Maryland Β· Transmission lines in Maryland

Other requests in Carroll County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem