United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2010-048, Graham County
Onshore wind project GEN-2010-048, Graham County is a 70.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Graham County, Kansas, connecting to MIDW.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2010 (completed)
- Withdrawn / abandonedJan 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2010-048
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- MIDW
- Connection point (POI)
- Tap Substation on the Beach Station βΓΓ¬ Redline 115kV line
- Location
- Graham County, Kansas
- Technology
- Wind: 70.0 MW
- Total requested
- 70.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 September 2010
- Proposed online date
- December 2017
- Withdrawn
- January 2017
Location
Marker shows the centre of Graham County; the queue data does not give exact sites.
Other requests in Graham County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem