SOLAR + STORAGE · SOUTHEASTSolar + storage project LGE-CS2025-004, Lincoln County
Solar + storage project LGE-CS2025-004, Lincoln County is a 200 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Lincoln County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
- PlanningQueued Dec 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- LGE-CS2025-004
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- West Garrard - Pineville 345 kV line
- Location
- Lincoln County, Kentucky
- Technology
- Solar: 200 MW · Battery
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 15 December 2025
- Proposed online date
- December 2029
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Other requests in Lincoln County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem