πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

SOLAR + STORAGE Β· SOUTHEAST

Solar + storage project LGE-GIS-2022-007, Lincoln County

Solar + storage project LGE-GIS-2022-007, Lincoln County is a 150 MW solar + storage request withdrawn in the Southeast interconnection queue, in Lincoln County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LGE-GIS-2022-007
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Louisville Gas & Electric and Kentucky Utilities Energy
Connection point (POI)
West Garrard β€šΓ„Γ¬ Pineville 345 kV line
Location
Lincoln County, Kentucky
Technology
Solar: 150 MW Β· Battery
Total requested
150 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
6 September 2022
Proposed online date
October 2026

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem