United States › Grid › Interconnection queues › Illinois
ONSHORE WIND · PJMZEP Valley Wind Farm
ZEP Valley Wind Farm is a 79.1 MW onshore wind request withdrawn in the PJM interconnection queue, in Tazewell County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedOct 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC1-171
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Powerton
- Location
- Tazewell County, Illinois
- Technology
- Wind: 79.1 MW
- Total requested
- 79.1 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 31 October 2016
- Proposed online date
- December 2025
- Withdrawn
- October 2022
Location
Marker shows the centre of Tazewell County; the queue data does not give exact sites.
Other requests in Tazewell County
- Battery storage project J3946, Tazewell CountyBattery storage · 300 MW · in study
- Solar project AG2-363, Tazewell CountySolar · 300 MW · in study
- Onshore wind project J1926, Tazewell CountyOnshore wind · 200 MW · in study
- Battery storage project J3298, Tazewell CountyBattery storage · 200 MW · in study
- Solar project AG2-364, Tazewell CountySolar · 200 MW · in study
- Battery storage project J2575, Tazewell CountyBattery storage · 198 MW · in study
- Onshore wind project J3905, Tazewell CountyOnshore wind · 175 MW · in study
- Battery storage project J3904, Tazewell CountyBattery storage · 175 MW · in study
- Solar project J1653, Tazewell CountySolar · 150 MW · in study
- Onshore wind project J3456, Tazewell CountyOnshore wind · 100 MW · in study
- Onshore wind project J1725, Tazewell CountyOnshore wind · 100 MW · in study
- Battery storage project J1882, Tazewell CountyBattery storage · 45.0 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem