United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2011-034, Hall County
Onshore wind project GEN-2011-034, Hall County is a 31.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Hall County, Texas, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2011 (completed)
- Withdrawn / abandonedAug 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2011-034
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Windy Buttes - Estelline 69 KV
- Location
- Hall County, Texas
- Technology
- Wind: 31.0 MW
- Total requested
- 31.0 MW
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 13 June 2011
- Proposed online date
- December 2013
- Withdrawn
- August 2011
Location
Marker shows the centre of Hall County; the queue data does not give exact sites.
Other requests in Hall County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem