United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR + STORAGE Β· PJMSolar + storage project AG2-603, Carroll County
Solar + storage project AG2-603, Carroll County is a 77.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Carroll County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-603
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Developer
- Issa Solar LLC
- Connection point (POI)
- Huffman 138 kV
- Location
- Carroll County, Virginia
- Technology
- Solar: 77.0 MW Β· Battery
- Total requested
- 77.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- October 2024
- Withdrawn
- June 2025
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Other requests in Carroll County
- Solar + storage project AH1-098, Carroll CountySolar + storage Β· 40.0 MW Β· in study
- Buck & Byllesby Hydro ProjectBattery storage Β· 4.0 MW Β· built
- Solar project AG2-190, Carroll CountySolar Β· 77.4 MW Β· withdrawn
- Poplar CampOnshore wind Β· 72.0 MW Β· withdrawn
- Solar project AH1-172, Carroll CountySolar Β· 20.0 MW Β· withdrawn
- Solar + storage project AH1-097, Carroll CountySolar + storage Β· 20.0 MW Β· withdrawn
- Solar project AH1-177, Carroll CountySolar Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem