United States › Grid › Interconnection queues › Virginia

BATTERY STORAGE · PJM

Buck & Byllesby Hydro Project

Buck & Byllesby Hydro Project is a 4.0 MW battery storage request built and operating in the PJM interconnection queue, in Carroll County, Virginia, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Apr 2018 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2019 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AD2-205
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Byllesby 69 kV
Location
Carroll County, Virginia
Technology
Battery: 4.0 MW
Total requested
4.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
13 April 2018
Proposed online date
December 2018
Came online
January 2019

Location

Marker shows the centre of Carroll County; the queue data does not give exact sites.