SOLAR Β· SOUTHEASTSolar project LGE-GIS-2018-005, Mclean County
Solar project LGE-GIS-2018-005, Mclean County is a 60.0 MW solar request withdrawn in the Southeast interconnection queue, in Mclean County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2018-005
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- Rumsey - Pettit 69 kV line
- Location
- Mclean County, Kentucky
- Technology
- Solar: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 1 October 2018
- Proposed online date
- June 2022
Location
Marker shows the centre of Mclean County; the queue data does not give exact sites.
Other requests in Mclean County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem