Solar project LGE-GIS-2018-005, Mclean County

Solar project LGE-GIS-2018-005, Mclean County is a 60.0 MW solar request withdrawn in the Southeast interconnection queue, in Mclean County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LGE-GIS-2018-005
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Louisville Gas & Electric and Kentucky Utilities Energy
Connection point (POI)
Rumsey - Pettit 69 kV line
Location
Mclean County, Kentucky
Technology
Solar: 60.0 MW
Total requested
60.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
1 October 2018
Proposed online date
June 2022

Location

Marker shows the centre of Mclean County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Mclean County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem