United States › Grid › Interconnection queues › Virginia

BATTERY STORAGE · PJM

Summersweet Energy Center, LLC

Summersweet Energy Center, LLC is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Fauquier County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-089
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Summersweet Energy Center, LLC
Connection point (POI)
Morrisville 230kV
Location
Fauquier County, Virginia
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
6 February 2025
Proposed online date
July 2023
Withdrawn
November 2025

Location

Marker shows the centre of Fauquier County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Fauquier County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem