United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
BATTERY STORAGE Β· SOUTHEASTBattery storage project 20200921002, Hampton County
Battery storage project 20200921002, Hampton County is a 10.0 MW battery storage request withdrawn in the Southeast interconnection queue, in Hampton County, South Carolina, connecting to Dominion Energy South Carolina.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20200921002
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Dominion Energy South Carolina
- Connection point (POI)
- Estill Southside
- Location
- Hampton County, South Carolina
- Technology
- Battery: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Proposed online date
- December 2021
Location
Marker shows the centre of Hampton County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Hampton County
- Solar project 316, Hampton CountySolar Β· 150 MW Β· in study
- Solar project 266, Hampton CountySolar Β· 100 MW Β· in study
- Solar project 20220112001, Hampton CountySolar Β· 75.0 MW Β· in study
- Battery storage project 234, Hampton CountyBattery storage Β· 75.0 MW Β· in study
- Battery storage project 20211221001, Hampton CountyBattery storage Β· 75.0 MW Β· in study
- Solar project 132, Hampton CountySolar Β· 75.0 MW Β· in study
- Solar project 187, Hampton CountySolar Β· 100 MW Β· withdrawn
- Solar project 20240829016, Hampton CountySolar Β· 50.0 MW Β· withdrawn
- Battery storage project 20191213001, Hampton CountyBattery storage Β· 2.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem