πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G517, Cottonwood County

Onshore wind project G517, Cottonwood County is a 130 MW onshore wind request withdrawn in the MISO interconnection queue, in Cottonwood County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G517
Grid region
MISO (Midcontinent)
Connection point (POI)
Summit Switch Station - South Storden 69 kV line
Location
Cottonwood County, Minnesota
Technology
Wind: 130 MW
Total requested
130 MW
Study phase
PHASE 3
Queue status
Withdrawn
Entered queue
16 June 2017
Proposed online date
October 2006
Withdrawn
October 2019

Location

Marker shows the centre of Cottonwood County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Cottonwood County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem