United States β€Ί Grid β€Ί Interconnection queues β€Ί Tennessee

SOLAR Β· PJM

Solar project AH1-534, Greene County

Solar project AH1-534, Greene County is a 22.7 MW solar request withdrawn in the PJM interconnection queue, in Greene County, Tennessee, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-534
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Sullivan Gardens - Walters 138 kV
Location
Greene County, Tennessee
Technology
Solar: 22.7 MW
Total requested
22.7 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
March 2025
Withdrawn
December 2024

Location

Marker shows the centre of Greene County; the queue data does not give exact sites.

Power plants in Tennessee Β· Transmission lines in Tennessee

Other requests in Greene County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem