Solar project 672, Rankin County

Solar project 672, Rankin County is a 140 MW solar request in interconnection study in the Southeast interconnection queue, in Rankin County, Mississippi, connecting to Tennessee Valley Authority.

Queue statusIn planning
  1. PlanningQueued Oct 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
672
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Connection point (POI)
TVA's Sebastopol-Leake 161kV TL
Location
Rankin County, Mississippi
Technology
Solar: 140 MW
Total requested
140 MW
Study phase
Cluster Study
Queue status
Active
Entered queue
30 October 2024
Proposed online date
September 2027

Location

Marker shows the centre of Rankin County; the queue data does not give exact sites.

Power plants in Mississippi · Transmission lines in Mississippi

Other requests in Rankin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem