United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· SOUTHEASTSolar project 572, Rankin County
Solar project 572, Rankin County is a 240 MW solar request withdrawn in the Southeast interconnection queue, in Rankin County, Mississippi, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 572
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Rankin County, Mississippi
- Technology
- Solar: 240 MW
- Total requested
- 240 MW
- Queue status
- Withdrawn
- Entered queue
- 27 June 2023
- Proposed online date
- September 2026
Location
Marker shows the centre of Rankin County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Rankin County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem