Onshore wind project GI-0925, Griggs County is a 60.0 MW onshore wind request withdrawn in the West interconnection queue, in Griggs County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0925
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Jamestown-Grand Forks 230kV
- Location
- Griggs County, North Dakota
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 31 August 2009
- Proposed online date
- December 2012
Location
Marker shows the centre of Griggs County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem