United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR + STORAGE Β· WEST

Solar + storage project 166, Graham County

Solar + storage project 166, Graham County is a 485 MW solar + storage request withdrawn in the West interconnection queue, in Graham County, Arizona, connecting to Tucson Electric Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
166
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tucson Electric Power Company
Connection point (POI)
Greenlee-Winchester 345kV Transmission Line
Location
Graham County, Arizona
Technology
Solar: 485 MW Β· Battery
Total requested
485 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
17 April 2024
Proposed online date
February 2028

Location

Marker shows the centre of Graham County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem