United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· SOUTHEASTSolar project 20479, Hoke County
Solar project 20479, Hoke County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Hoke County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20479
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Masked
- Connection point (POI)
- Ft. Bragg Woodruff St Richmond 230KV
- Location
- Hoke County, North Carolina
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 9 March 2018
Location
Marker shows the centre of Hoke County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Hoke County
- Solar project 977831, Hoke CountySolar Β· 49.9 MW Β· in study
- Onshore wind project 4895, Hoke CountyOnshore wind Β· 101 MW Β· withdrawn
- Onshore wind project 4896, Hoke CountyOnshore wind Β· 101 MW Β· withdrawn
- Solar project 896799, Hoke CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 570034, Hoke CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 138316, Hoke CountySolar Β· 74.0 MW Β· withdrawn
- Solar project 962964, Hoke CountySolar Β· 45.0 MW Β· withdrawn
- Solar project 918003, Hoke CountySolar Β· 45.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem