United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR Β· SPPSolar project GEN-2023-020, Marshall County
Solar project GEN-2023-020, Marshall County is a 220 MW solar request withdrawn in the SPP interconnection queue, in Marshall County, Oklahoma, connecting to WFEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-020
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- Russett-S Brown 138 kV
- Location
- Marshall County, Oklahoma
- Technology
- Solar: 220 MW
- Total requested
- 220 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- September 2026
- Withdrawn
- March 2024
Location
Marker shows the centre of Marshall County; the queue data does not give exact sites.
Other requests in Marshall County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem