πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G0742, Grant County

Onshore wind project G0742, Grant County is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Grant County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0742
Grid region
West (non-ISO utilities)
Connection point (POI)
Vantage - Hanford No 1 500 kV line; Midway - Rocky Ford No 1 230 kV line; Midway - Potholes No 1 230 kV line.
Location
Grant County, Washington
Technology
Wind: 300 MW
Total requested
300 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
20 May 2022
Proposed online date
June 2026

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem