United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOAbrams Solar
Abrams Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in St. Lawrence County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandonedAug 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1336
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Granada Solar, LLC
- Connection point (POI)
- Alcoa - N. Ogdensburg 115 kV
- Location
- St. Lawrence County, New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 24 February 2022
- Withdrawn
- August 2023
Location
Marker shows the centre of St. Lawrence County; the queue data does not give exact sites.
Other requests in St. Lawrence County
- Rich Road Solar Energy CenterSolar + storage Β· 240 MW Β· in study
- NY125B - Two Rivers SolarSolar Β· 200 MW Β· in study
- Gateway Solar Energy CenterSolar Β· 180 MW Β· in study
- Morris SolarSolar Β· 20.0 MW Β· in study
- Fairway SolarSolar Β· 20.0 MW Β· in study
- BR Benson Mines SolarSolar Β· 12.1 MW Β· in study
- Riverbank Power D1Battery storage Β· 1,000 MW Β· withdrawn
- Riverbank Power D2Hydro Β· 1,000 MW Β· withdrawn
- Cedar Lake StorageBattery storage Β· 300 MW Β· withdrawn
- Rich Road Solar Energy CenterSolar + storage Β· 240 MW Β· withdrawn
- Amber Solar and StorageSolar + storage Β· 232 MW Β· withdrawn
- St Lawrence Data and Agricultural CenterOther Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem