United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
BATTERY STORAGE Β· MISOBattery storage project J3618, Clay County
Battery storage project J3618, Clay County is a 150 MW battery storage request withdrawn in the MISO interconnection queue, in Clay County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3618
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- DATTO
- Location
- Clay County, Arkansas
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 16 April 2024
- Proposed online date
- September 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Clay County; the queue data does not give exact sites.
Other requests in Clay County
- Solar project J2351, Clay CountySolar Β· 200 MW Β· in study
- Solar project J2954, Clay CountySolar Β· 100 MW Β· in study
- Onshore wind project J4027, Clay CountyOnshore wind Β· 250 MW Β· withdrawn
- Solar + storage project J3117, Clay CountySolar + storage Β· 200 MW Β· withdrawn
- Solar project J3617, Clay CountySolar Β· 150 MW Β· withdrawn
- Solar project J2984, Clay CountySolar Β· 150 MW Β· withdrawn
- Solar project J1414, Clay CountySolar Β· 150 MW Β· withdrawn
- Battery storage project J2996, Clay CountyBattery storage Β· 50.0 MW Β· withdrawn
- Battery storage project J1250, Clay CountyBattery storage Β· 35.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem