United States βΊ Grid βΊ Interconnection queues βΊ Tennessee
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 531, Mcnairy County
Solar + storage project 531, Mcnairy County is a 200 MW solar + storage request withdrawn in the Southeast interconnection queue, in Mcnairy County, Tennessee, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 531
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Mcnairy County, Tennessee
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 7 March 2023
Location
Marker shows the centre of Mcnairy County; the queue data does not give exact sites.
Power plants in Tennessee Β· Transmission lines in Tennessee
Other requests in Mcnairy County
- Battery storage project 25RSC-007, Mcnairy CountyBattery storage Β· 100 MW Β· in study
- Solar project 25RSC-006, Mcnairy CountySolar Β· 62.0 MW Β· in study
- Solar + storage project 444, Mcnairy CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project 543, Mcnairy CountySolar Β· 84.0 MW Β· withdrawn
- Battery storage project 605, Mcnairy CountyBattery storage Β· 81.0 MW Β· withdrawn
- Solar project 603, Mcnairy CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 646, Mcnairy CountySolar Β· 66.0 MW Β· withdrawn
- Solar project 610, Mcnairy CountySolar Β· 60.0 MW Β· withdrawn
- Other project 237, Mcnairy CountyOther Β· 16.0 MW Β· withdrawn
- Hydro project 233, Mcnairy CountyHydro Β· 16.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem