United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J2769, St. Helena Parish County
Solar project J2769, St. Helena Parish County is a 200 MW solar request withdrawn in the MISO interconnection queue, in St. Helena Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2769
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Amite - Gillsburg Tap 115 kV
- Location
- St. Helena Parish County, Louisiana
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- September 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of St. Helena Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in St. Helena Parish County
- Solar + storage project J2302, St. Helena Parish CountySolar + storage Β· 400 MW Β· in study
- Solar + storage project J3591, St. Helena Parish CountySolar + storage Β· 400 MW Β· in study
- Solar + storage project J3068, St. Helena Parish CountySolar + storage Β· 110 MW Β· withdrawn
- Solar project J640, St. Helena Parish CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem