United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· SOUTHEASTSolar project 20857, Beaufort County
Solar project 20857, Beaufort County is a 75.0 MW solar request withdrawn in the Southeast interconnection queue, in Beaufort County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20857
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Masked
- Connection point (POI)
- Aurora-Greenville 230kV
- Location
- Beaufort County, North Carolina
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 2 April 2018
Location
Marker shows the centre of Beaufort County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Beaufort County
- Solar project AC2-108, Beaufort CountySolar Β· 100 MW Β· withdrawn
- Solar project AF2-242, Beaufort CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 20853, Beaufort CountySolar Β· 75.0 MW Β· withdrawn
- Battery storage project AE1-005, Beaufort CountyBattery storage Β· 20.0 MW Β· withdrawn
- Battery storage project AE1-088, Beaufort CountyBattery storage Β· 20.0 MW Β· withdrawn
- Battery storage project AD2-094, Beaufort CountyBattery storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem