United States βΊ Grid βΊ Interconnection queues βΊ Missouri
ONSHORE WIND Β· MISOOnshore wind project J1082, Grundy County
Onshore wind project J1082, Grundy County is a 400 MW onshore wind request withdrawn in the MISO interconnection queue, in Grundy County, Missouri, connecting to Ameren Missouri.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1082
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Ameren Missouri
- Connection point (POI)
- Zachary 345 kV Substation
- Location
- Grundy County, Missouri
- Technology
- Wind: 400 MW
- Total requested
- 400 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2020
- Withdrawn
- March 2019
Location
Marker shows the centre of Grundy County; the queue data does not give exact sites.
Other requests in Grundy County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem