United States βΊ Grid βΊ Interconnection queues βΊ Delaware
OFFSHORE WIND Β· PJMBluewater Wind - Bethany
Bluewater Wind - Bethany is a 450 MW offshore wind request withdrawn in the PJM interconnection queue, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2006 (completed)
- Withdrawn / abandonedAug 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R36
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Bethany 138kV
- Location
- Delaware
- Technology
- Offshore Wind: 450 MW
- Total requested
- 450 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 8 November 2006
- Proposed online date
- June 2018
- Withdrawn
- August 2012
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem