COAL Β· MISOCoal project G942, Lorain County
Coal project G942, Lorain County is a 24.0 MW coal request withdrawn in the MISO interconnection queue, in Lorain County, Ohio.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2007 (completed)
- Withdrawn / abandonedJun 2010 (project stopped here)
- ConsentedJun 2010 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G942
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Avon Lake 345 kV Substation
- Location
- Lorain County, Ohio
- Technology
- Coal: 24.0 MW
- Total requested
- 24.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 26 December 2007
- Agreement signed
- 18 June 2010
- Proposed online date
- December 2011
- Withdrawn
- June 2010
Location
Marker shows the centre of Lorain County; the queue data does not give exact sites.
Other requests in Lorain County
- West Lorain Power Plant 345 kVGas Β· 406 MW Β· agreement signed
- West Lorain Power Plant 345 kVGas Β· 33.0 MW Β· agreement signed
- West Lorain 138 kV Power PlantGas Β· 11.3 MW Β· agreement signed
- West Lorain 138 kV Power PlantGas Β· 8.0 MW Β· agreement signed
- Solar project AH2-345, Lorain CountySolar Β· 120 MW Β· in study
- Solar project AI1-139, Lorain CountySolar Β· 14.8 MW Β· in study
- LorainOther Β· 19.2 MW Β· built
- Avon Lake PlantOther Β· 4.0 MW Β· built
- Battery storage project AI1-177, Lorain CountyBattery storage Β· 200 MW Β· withdrawn
- Solar + storage project AF1-279, Lorain CountySolar + storage Β· 150 MW Β· withdrawn
- Other project J173, Lorain CountyOther Β· 19.2 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem