United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project J064, Beltrami County

Onshore wind project J064, Beltrami County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Beltrami County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2009 (completed)
  2. Withdrawn / abandonedNov 2009 (project stopped here)
  3. ConsentedNov 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J064
Grid region
MISO (Midcontinent)
Connection point (POI)
Solway 115 kV Substation
Location
Beltrami County, Minnesota
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
20 August 2009
Agreement signed
25 November 2009
Proposed online date
September 2011
Withdrawn
November 2009

Location

Marker shows the centre of Beltrami County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Beltrami County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem