United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

SOLAR Β· MISO

Solar project MPC03000, Beltrami County

Solar project MPC03000, Beltrami County is a 12.0 MW solar request withdrawn in the MISO interconnection queue, in Beltrami County, Minnesota, connecting to Minnkota Power Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
MPC03000
Grid region
MISO (Midcontinent)
Utility / transmission owner
Minnkota Power Cooperative
Connection point (POI)
Bemidji 69 kV Line (CB 550)
Location
Beltrami County, Minnesota
Technology
Solar: 12.0 MW
Total requested
12.0 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
15 September 2016
Proposed online date
December 2017

Location

Marker shows the centre of Beltrami County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Beltrami County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem