United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J2040, Dickinson County
Onshore wind project J2040, Dickinson County is a 150 MW onshore wind request withdrawn in the MISO interconnection queue, in Dickinson County, Iowa, connecting to MIDAMERICAN ENERGY CO..
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2040
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- Lakefield - Obrien Co 345 kV (43.497803, -95.318336)
- Location
- Dickinson County, Iowa
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 3 August 2021
- Proposed online date
- November 2024
- Withdrawn
- October 2025
Location
Marker shows the centre of Dickinson County; the queue data does not give exact sites.
Other requests in Dickinson County
- Onshore wind project J982, Dickinson CountyOnshore wind Β· 300 MW Β· agreement signed
- Onshore wind project G298, Dickinson CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project G538, Dickinson CountyOnshore wind Β· 50.0 MW Β· built
- Onshore wind project G232, Dickinson CountyOnshore wind Β· 44.0 MW Β· built
- Onshore wind project J068, Dickinson CountyOnshore wind Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem