πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

SOLAR Β· WEST

Solar project 991, Tooele County

Solar project 991, Tooele County is a 45.0 MW solar request withdrawn in the West interconnection queue, in Tooele County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
991
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Tooele-Horseshoe line
Location
Tooele County, Utah
Technology
Solar: 45.0 MW
Total requested
45.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN BY CUSTOMER
Queue status
Withdrawn
Entered queue
11 December 2017
Proposed online date
December 2019

Location

Marker shows the centre of Tooele County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Tooele County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem