United States βΊ Grid βΊ Interconnection queues βΊ Iowa
SOLAR Β· MISOSolar project J1284, Linn County
Solar project J1284, Linn County is a 250 MW solar request withdrawn in the MISO interconnection queue, in Linn County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1284
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Duane Arnold - Tiffin (MEC) 345 kV Line Tap
- Location
- Linn County, Iowa
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- October 2023
- Withdrawn
- March 2021
Location
Marker shows the centre of Linn County; the queue data does not give exact sites.
Other requests in Linn County
- Solar project J504, Linn CountySolar Β· 50.0 MW Β· agreement signed
- Gas project E0050, Linn CountyGas Β· 987 MW Β· in study
- Nuclear project J3932, Linn CountyNuclear Β· 646 MW Β· in study
- Solar project J2268, Linn CountySolar Β· 400 MW Β· in study
- Battery storage project J2469, Linn CountyBattery storage Β· 300 MW Β· in study
- Replacing 244 MW of Solar with Nuclear; Duane ArnoldNuclear Β· 251 MW Β· in study
- Solar project J1444, Linn CountySolar Β· 200 MW Β· in study
- Replacing 200 MW of Solar with Nuclear; J1444Nuclear Β· 200 MW Β· in study
- Battery storage project J4155, Linn CountyBattery storage Β· 195 MW Β· in study
- Replacing 100 MW of Solar with Nuclear; Duane ArnoldNuclear Β· 100 MW Β· in study
- Battery storage project J2120, Linn CountyBattery storage Β· 100 MW Β· in study
- Gas project J1359, Linn CountyGas Β· 95.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem