United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
HYDRO Β· MISOHydro project J071, Bracken County
Hydro project J071, Bracken County is a 112 MW hydro request withdrawn in the MISO interconnection queue, in Bracken County, Kentucky.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2009 (completed)
- Withdrawn / abandonedAug 2011 (project stopped here)
- ConsentedAug 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J071
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- DEM Zimmer - Silver Grove 345 kV
- Location
- Bracken County, Kentucky
- Technology
- Hydro: 112 MW
- Total requested
- 112 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 30 September 2009
- Agreement signed
- 11 August 2011
- Proposed online date
- April 2010
- Withdrawn
- August 2011
Location
Marker shows the centre of Bracken County; the queue data does not give exact sites.
Other requests in Bracken County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem