United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

HYDRO Β· MISO

Hydro project G539, Bracken County

Hydro project G539, Bracken County is a 80.0 MW hydro request withdrawn in the MISO interconnection queue, in Bracken County, Kentucky.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2005 (completed)
  2. Withdrawn / abandonedOct 2005 (project stopped here)
  3. ConsentedOct 2005 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G539
Grid region
MISO (Midcontinent)
Connection point (POI)
2 miles south of Meldahl Dam at existing 138 kV KU line.
Location
Bracken County, Kentucky
Technology
Hydro: 80.0 MW
Total requested
80.0 MW
Queue status
Withdrawn
Entered queue
15 August 2005
Agreement signed
13 October 2005
Proposed online date
September 2007
Withdrawn
October 2005

Location

Marker shows the centre of Bracken County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Bracken County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem