United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project R60, Sac County
Onshore wind project R60, Sac County is a 54.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Sac County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2009 (completed)
- Withdrawn / abandonedJan 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R60
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Clipper (Intrepid) - expansion
- Location
- Sac County, Iowa
- Technology
- Wind: 54.0 MW
- Total requested
- 54.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 8 April 2009
- Proposed online date
- June 2010
- Withdrawn
- January 2017
Location
Marker shows the centre of Sac County; the queue data does not give exact sites.
Other requests in Sac County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem