United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMSolar project Y3-095, Queen Anne's County
Solar project Y3-095, Queen Anne's County is a 2.0 MW solar request withdrawn in the PJM interconnection queue, in Queen Anne's County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2013 (completed)
- Withdrawn / abandonedMay 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y3-095
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Centreville 12kV
- Location
- Queen Anne's County, Maryland
- Technology
- Solar: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 29 April 2013
- Proposed online date
- September 2013
- Withdrawn
- May 2013
Location
Marker shows the centre of Queen Anne's County; the queue data does not give exact sites.
Other requests in Queen Anne's County
- Cedar Lane SolarSolar Β· 4.0 MW Β· agreement signed
- Battery storage project AG2-380, Queen Anne's CountyBattery storage Β· 20.0 MW Β· in study
- Solar project AI2-350, Queen Anne's CountySolar Β· 11.9 MW Β· in study
- Concho Solar ISolar Β· 49.0 MW Β· suspended
- Concho Solar ISolar Β· 20.0 MW Β· suspended
- Concho Solar ISolar Β· 17.0 MW Β· suspended
- Jones Farm Lane SolarSolar Β· 64.0 MW Β· built
- Pondtown Solar 2Solar Β· 20.0 MW Β· built
- Pondtown Solar 2Solar Β· 20.0 MW Β· built
- Pondtown Solar 1Solar Β· 19.8 MW Β· built
- Pondtown Solar 1Solar Β· 19.8 MW Β· built
- Church Hill Solar FarmSolar Β· 6.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem