SOLAR Β· NYISODouble Lock Solar
Double Lock Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in Herkimer County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2016 (completed)
- Withdrawn / abandonedJul 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 563
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Double Lock Solar, LLC
- Connection point (POI)
- St. Johnsville - Marshville 115kV
- Location
- Herkimer County, New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 25 July 2016
- Withdrawn
- July 2019
Location
Marker shows the centre of Herkimer County; the queue data does not give exact sites.
Other requests in Herkimer County
- Hills SolarSolar Β· 20.0 MW Β· in study
- Flat Hill SolarSolar Β· 20.0 MW Β· in study
- Millers Grove SolarSolar Β· 20.0 MW Β· in study
- Grassy Knoll SolarSolar Β· 20.0 MW Β· in study
- Watkins Rd SolarSolar Β· 20.0 MW Β· in study
- Fairfield Wind ProjectOnshore wind Β· 74.0 MW Β· built
- Fairfield Wind ProjectOnshore wind Β· 74.0 MW Β· built
- Diamond SolarSolar Β· 500 MW Β· withdrawn
- Wheelhouse Solar Energy CenterSolar + storage Β· 350 MW Β· withdrawn
- Columbia Solar Energy CenterSolar Β· 350 MW Β· withdrawn
- Rocksdrift Energy CenterSolar Β· 300 MW Β· withdrawn
- Swift SolarSolar + storage Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem