Double Lock Solar

Double Lock Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in Herkimer County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2016 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
563
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Double Lock Solar, LLC
Connection point (POI)
St. Johnsville - Marshville 115kV
Location
Herkimer County, New York
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
25 July 2016
Withdrawn
July 2019

Location

Marker shows the centre of Herkimer County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Herkimer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem