United States › Grid › Interconnection queues › New York
SOLAR + STORAGE · NYISOWheelhouse Solar Energy Center
Wheelhouse Solar Energy Center is a 350 MW solar + storage request withdrawn in the NYISO interconnection queue, in Herkimer County, New York, connecting to NYPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-188
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYPA
- Developer
- Wheelhouse Solar Energy Center, LLC
- Connection point (POI)
- Edic 345 kV to Princetown 345 kV circuit #352
- Location
- Herkimer County, New York
- Technology
- Solar: 350 MW · Battery
- Total requested
- 350 MW
- Queue status
- Withdrawn
- Entered queue
- 18 September 2024
Location
Marker shows the centre of Herkimer County; the queue data does not give exact sites.
Other requests in Herkimer County
- Hills SolarSolar · 20.0 MW · in study
- Flat Hill SolarSolar · 20.0 MW · in study
- Millers Grove SolarSolar · 20.0 MW · in study
- Grassy Knoll SolarSolar · 20.0 MW · in study
- Watkins Rd SolarSolar · 20.0 MW · in study
- Fairfield Wind ProjectOnshore wind · 74.0 MW · built
- Fairfield Wind ProjectOnshore wind · 74.0 MW · built
- Diamond SolarSolar · 500 MW · withdrawn
- Columbia Solar Energy CenterSolar · 350 MW · withdrawn
- Rocksdrift Energy CenterSolar · 300 MW · withdrawn
- Swift SolarSolar + storage · 300 MW · withdrawn
- 117656 North Creek Solar+StorageSolar + storage · 207 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem