United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

ONSHORE WIND Β· WEST

Onshore wind project Q88, Navajo County

Onshore wind project Q88, Navajo County is a 18.9 MW onshore wind request withdrawn in the West interconnection queue, in Navajo County, Arizona, connecting to Arizona Public Service.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q88
Grid region
West (non-ISO utilities)
Utility / transmission owner
Arizona Public Service
Connection point (POI)
Sugarloaf 69 kV Substation
Location
Navajo County, Arizona
Technology
Wind: 18.9 MW
Total requested
18.9 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
29 December 2009
Proposed online date
December 2010

Location

Marker shows the centre of Navajo County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Navajo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem