United States βΊ Grid βΊ Interconnection queues βΊ Montana
SOLAR Β· WESTSolar project 258, Phillips County
Solar project 258, Phillips County is a 3.0 MW solar request withdrawn in the West interconnection queue, in Phillips County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2016 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 258
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Malta East Rural, Saco, MT
- Location
- Phillips County, Montana
- Technology
- Solar: 3.0 MW
- Total requested
- 3.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 29 February 2016
- Proposed online date
- November 2016
Location
Marker shows the centre of Phillips County; the queue data does not give exact sites.
Other requests in Phillips County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem