United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J1079, St. Charles Parish County
Solar project J1079, St. Charles Parish County is a 200 MW solar request withdrawn in the MISO interconnection queue, in St. Charles Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedAug 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1079
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Waterford 1&2 230 kV Substation
- Location
- St. Charles Parish County, Louisiana
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2021
- Withdrawn
- August 2019
Location
Marker shows the centre of St. Charles Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in St. Charles Parish County
- Waterford 5Gas Β· 478 MW Β· in study
- Nuclear project J3815, St. Charles Parish CountyNuclear Β· 153 MW Β· in study
- Gas project J396, St. Charles Parish CountyGas Β· 1,020 MW Β· built
- Gas project J482, St. Charles Parish CountyGas Β· 26.2 MW Β· built
- Gas project J425, St. Charles Parish CountyGas Β· 999 MW Β· withdrawn
- Gas project J3871, St. Charles Parish CountyGas Β· 770 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem