SOLAR Β· SOUTHEASTSolar project 39370, Sumter County
Solar project 39370, Sumter County is a 100 MW solar request withdrawn in the Southeast interconnection queue, in Sumter County, South Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2016 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 39370
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Duke Energy Renewables Solar LLC
- Location
- Sumter County, South Carolina
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 9 May 2016
Location
Marker shows the centre of Sumter County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Sumter County
- Solar project 191, Sumter CountySolar Β· 200 MW Β· in study
- Solar project 15918, Sumter CountySolar Β· 100 MW Β· withdrawn
- Solar project 5224, Sumter CountySolar Β· 100 MW Β· withdrawn
- Solar + storage project 204, Sumter CountySolar + storage Β· 75.0 MW Β· withdrawn
- Solar project 920655, Sumter CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 128, Sumter CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 911187, Sumter CountySolar Β· 74.9 MW Β· withdrawn
- Battery storage project 221, Sumter CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar + storage project 163, Sumter CountySolar + storage Β· 50.0 MW Β· withdrawn
- Solar project 276, Sumter CountySolar Β· 49.9 MW Β· withdrawn
- Solar project 918717, Sumter CountySolar Β· 40.0 MW Β· withdrawn
- Solar project 103, Sumter CountySolar Β· 7.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem