United States βΊ Grid βΊ Interconnection queues βΊ Kansas
COAL Β· SPPCoal project GEN-2004-013, Atchison County
Coal project GEN-2004-013, Atchison County is a 900 MW coal request withdrawn in the SPP interconnection queue, in Atchison County, Kansas, connecting to KCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2004 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2004-013
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KCPL
- Location
- Atchison County, Kansas
- Technology
- Coal: 900 MW
- Total requested
- 900 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 20 April 2004
- Proposed online date
- June 2010
Location
Marker shows the centre of Atchison County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem