United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

SOLAR + STORAGE Β· PJM

Solar + storage project AI1-108, Rockingham County

Solar + storage project AI1-108, Rockingham County is a 38.5 MW solar + storage request withdrawn in the PJM interconnection queue, in Rockingham County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2022 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AI1-108
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Endless Caverns - Timberville 115 kV
Location
Rockingham County, Virginia
Technology
Solar: 38.5 MW Β· Battery
Total requested
38.5 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
31 August 2022
Proposed online date
January 2026
Withdrawn
April 2025

Location

Marker shows the centre of Rockingham County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Rockingham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem