United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMDulles Solar and BESS
Dulles Solar and BESS is a 50.0 MW battery storage request with a signed interconnection agreement in the PJM interconnection queue, in Loudoun County, Virginia, connecting to Dominion.
Queue statusConsented
- PlanningQueued Sep 2020 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Oct 2027 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AG1-221
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Poland Rd-Runway DP 230 kV
- Location
- Loudoun County, Virginia
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Active
- Entered queue
- 23 September 2020
- Proposed online date
- October 2027
Location
Marker shows the centre of Loudoun County; the queue data does not give exact sites.
Other requests in Loudoun County
- New Road StorageBattery storage · 120 MW · agreement signed
- Dulles Solar and BESSSolar · 100 MW · agreement signed
- Battery storage project AH1-727, Loudoun CountyBattery storage · 425 MW · in study
- Evergreen Energy CenterBattery storage · 20.0 MW · in study
- Stonewall Energy ParkGas · 800 MW · built
- Battery storage project AG1-534, Loudoun CountyBattery storage · 200 MW · withdrawn
- Battery storage project AG2-287, Loudoun CountyBattery storage · 150 MW · withdrawn
- Battery storage project AG1-020, Loudoun CountyBattery storage · 150 MW · withdrawn
- Battery storage project AG2-285, Loudoun CountyBattery storage · 150 MW · withdrawn
- Battery storage project AG2-323, Loudoun CountyBattery storage · 100 MW · withdrawn
- Battery storage project AG2-325, Loudoun CountyBattery storage · 100 MW · withdrawn
- Battery storage project AH1-729, Loudoun CountyBattery storage · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem