United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J2030, Isanti County
Solar project J2030, Isanti County is a 120 MW solar request withdrawn in the MISO interconnection queue, in Isanti County, Minnesota, connecting to GREAT RIVER ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2021 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2030
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- ISANTTI TAP to ATHNSSW 69kV
- Location
- Isanti County, Minnesota
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 21 July 2021
- Proposed online date
- October 2024
- Withdrawn
- October 2025
Location
Marker shows the centre of Isanti County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Isanti County