United States βΊ Grid βΊ Interconnection queues βΊ Michigan
BATTERY STORAGE Β· MISOBattery storage project J1951, Monroe County
Battery storage project J1951, Monroe County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Monroe County, Michigan, connecting to ITC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1951
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC
- Connection point (POI)
- Lemoyne-Majestic 345kV
- Location
- Monroe County, Michigan
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 24 August 2021
- Proposed online date
- October 2024
- Withdrawn
- September 2023
Location
Marker shows the centre of Monroe County; the queue data does not give exact sites.
Other requests in Monroe County
- Gas project J4024, Monroe CountyGas Β· 1,499 MW Β· in study
- Gas project J4025, Monroe CountyGas Β· 1,499 MW Β· in study
- Monroe ERASBattery storage Β· 432 MW Β· in study
- Battery storage project J3994, Monroe CountyBattery storage Β· 360 MW Β· in study
- Battery storage project J3845, Monroe CountyBattery storage Β· 250 MW Β· in study
- FERMI Storage ProjectBattery storage Β· 248 MW Β· in study
- Solar project J3803, Monroe CountySolar Β· 200 MW Β· in study
- Battery storage project J2475, Monroe CountyBattery storage Β· 200 MW Β· in study
- Solar project J2486, Monroe CountySolar Β· 200 MW Β· in study
- Solar project J2484, Monroe CountySolar Β· 100 MW Β· in study
- Nuclear project G350, Monroe CountyNuclear Β· 159 MW Β· built
- Nuclear project G867, Monroe CountyNuclear Β· 1,563 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem